The Transmission Company of Nigeria (TCN) wishes to announce to the general public that the two transformers taken out late last year at its Benin substation and Ihovbor work centre for upgrade have been successfully upgraded and energized.
At the132kV Benin substation, TCN completed and energized a new 100MVA132/33KV power transformer on the 3rd of February, 2024 while at the Ihovbor work centre, a 100MVA power transformer was energized on the 29th of January 2024.
While the energized transformer at Ihovbor 132/33kV work centre will provide increased bulk supply to Benin Electricity Distribution Company (BEDC) for onward supply to Egba, Oluku, Ihovbor and its environs, the newly energized 100MVA transformer at Benin substation will increase the substation's capacity from 240MVA to 300MVA.
Before the recent upgrade, the Benin transmission substation had two 60MVA, one 80 MVA, and one 40MVA 132 /33 KV mobitra transformer which was upgraded to 100MVA power transformer.
Whilst Ihovbor had 2 x 60MVA of which one has been upgraded to 100MVA. Capacity at Ihovbor rose from 120MVA to 160 MVA
With the recent upgrade, TCN has increased its capacity to wheel more bulk power to Benin Disco for onward evacuation to its customers.
The projects are part of the collaborative efforts of the World Bank and TCN Management to boost bulk power transmission nationwide.
Ndidi Mbah GM, Public Affairs 14/3/24